Abstract

Abstract In on-line integrated production–distribution problems, customers release jobs to a manufacturer that has to process the jobs and deliver them to the customers. The jobs are released on-line, that is, at any time there is no information about future jobs. Processed jobs are grouped into batches, which are delivered to the customers as single shipments. The total cost (to be minimized) is the sum of the total weighted flow time and the total delivery cost. Such on-line integrated production–distribution problems have been studied for the case of uncapacitated batches. We consider the capacitated case with an upper bound on the size of a batch. For several versions of the problem, we present efficient on-line algorithms, and use competitive analysis to study their worst-case performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.