Abstract
This paper deals with the just in time control of flexible manufacturing systems when reference input is a priori known. The control is based on basic results of residuation in dioid algebra and a local scheduling rule of Early Due Date (to solve possible conflicts).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.