Abstract

In this paper we give an answer to the following question. Given a multi-port, linear ac network with instantaneous constant-power loads identify a set of active and reactive load powers for which there is no steady-state operating condition of the network—in this case, we say that the power load is inadmissible . The identification is given in terms of feasibility of simple linear matrix inequalities, and hence it can be easily verified with existing software. For one- or two-port networks, the proposed feasibility test is necessary and sufficient for load power admissibility with the test for the former case depending only on the network data. Two benchmark numerical examples illustrate our results.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call