Abstract

Most current real-time parallel applications can be modeled as a directed acyclic graph (DAG) task. Existing worst-case response time (WCRT) bounds (e.g., Graham's bound) derived for DAGs may be very pessimistic. No one precisely knows the gap between the WCRT bound and the actual WCRT. In this paper, we aim to derive the exact WCRT of a DAG task under the list scheduling upon multi-core platforms. We encode the WCRT analysis problem into a satisfaction modular theoretical (SMT) formulation based on insights into the list scheduling algorithm, and prove that our SMT program can solve the WCRT precisely, providing an accurate baseline to measure the tightness of the existing WCRT bounds. Experiments show that our method significantly improves the tightness of the WCRT bound, and is practically quite efficient, e.g., it can analyze DAGs with more than 40 vertices in a few seconds.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.