Abstract
A probabilistic scheduling period inventory model is developed for continuously deteriorating items, in which the lead time is exactly of one scheduling period, shortages are not allowed, and a general deterioration function is employed. The developed model is shown to be a generalization of the various, existing EOQ models for deteriorating items and the scheduling period model for nondeteriorating items. An example is also furnished.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.