Abstract

We characterize a nontrivial special case with a polynomial-time algorithm for a well-known parallel machine scheduling problem with precedence constraints, with a fixed number of machines, and with tasks of unit length. The special case is related to instances with given maximum path length and maximum degree of the task precedence graph. The method is based on the observation that the number of tasks is either small and bounded by a constant depending on the maximum path length and maximum degree, or alternatively, the number of tasks is large, giving a "dense" schedule.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.