Abstract

Australia remains in pole position to become the world’s leading exporter of liquefied natural gas (LNG) and the number one exporter in the future. Maintaining this trajectory will require the oil and gas industry in Australia to remain competitive in project delivery to continue to attract investments. Yet, the Australian project delivery environment poses a big threat to this trajectory. Several research studies, organisations and institutions have come up with a long list of generic factors contributing to project management success and failure. The aim of this study is to examine oil and gas projects in Australia with a view to ascertain their success or otherwise and the specific contributing factors. This study has used a qualitative method of research by examining secondary sources of information on four recent Western Australia LNG projects (Gorgon, Wheatstone, Prelude and Ichthys) and presenting them as case studies. Specifically, the research has used mostly online sources that are either independent reports or information sourced from company websites. The key findings suggest that major oil and gas projects in Australia fail, and that failure or success is determined by the ability of the project management team to deliver the project on budget and on schedule. This is exemplified by the projects examined in this study, which have all shown cost and schedule overruns. Six critical factors are observed as contributing to cost and schedule overrun: project location, high cost of executing projects in Australia versus overseas, skills shortages, overseas manufacturing, project complexity and cultural and environment issues. Innovation, collaboration and standardisation, as adopted from other regions, are the initial practices suggested for the Australian industry to overcome all six factors and encourage further investment.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call