Abstract

On June 14, 1987, the Ohio Coal Development Office (OCDO) executed a grant agreement with ICF Kaiser Engineers (ICF Kaiser) for the planning and design (Phase I) of a Demonstration Advanced Technology Coal Preparation Facility. Subsequently, on December 1, 1990, OCDO executed a grant agreement with the American Electric Power Service Corporation (AEPSC) through its subsidiary, the Ohio Power Company, for the final design and construction (Phase II), testing and operation (Phase III), and marketing and future operation (Phase IV) of the facility. These phases were subcontracted to ICF Kaiser. AEPSC co-sponsored the project and donated a site at the Central Ohio Coal Company`s Unionville Coal Preparation Plant for locating the test plant. Central Ohio Coal supplied coal handling services, waste-product disposal, and water. The Ohio Power Company provided project oversight, electric power, and the test coals. The test results from the operation of the 30 tph advanced coal cleaning plant demonstrated that combining conventional physical coal cleaning with emerging advanced physical coal cleaning technologies was a cost-effective method to reduce sulfur emissions of Ohio coals. The following is a summary of the key findings of this project.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call