Abstract
Decommissioning requirements for offshore renewable energy facilities in US federal waters requires that all facilities be removed and the seafloor be cleared of all obstructions at the end of the life of the lease. Before construction activities are permitted, developers are required to post a bond based on the estimated cost of decommissioning to ensure that the federal government is protected in case of company default. The purpose of this note is to provide weight algorithms of offshore wind farm components to estimate the lift requirements in decommissioning, the scrap value of material, and disposal cost. Weight algorithms are calibrated and compared with North Sea project data and examples illustrate the procedures. The component weights at the Cape Wind farm offshore Massachusetts are estimated.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.