Abstract

Offshore wind is the most mature of the offshore renewable energy technologies and has a significant role to play in the energy transition. 2000 GW of offshore wind capacity is anticipated globally by 2050 in order meet the targets of the Paris Agreement; 35 times the current installed capacity. The pace and scale of offshore wind ambitions to support the energy transition present a range of challenges for the offshore geotechnical sector and the broader offshore wind sector. Challenges extend across the life-cycle of projects from marine spatial planning, site investigation, design, manufacturing, installation, operation and decommissioning, and across the supply chain regarding availability of raw materials for foundations, anchors and mooring systems, vessels and equipment for site investigation and installation, and trained geotechnical personnel. This paper identifies five key challenges and sets out the necessary shifts in technology, culture and practice in geotechnical engineering to achieve the ambitious targets to deliver offshore wind at the pace and scale required for the energy transition. The paper closes with a reflection on the consequence of delaying or not meeting net-zero targets, and thus identifying the urgency for these shifts in technology, culture and practice to be developed and adopted.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.