Abstract

AbstractFor optimization of a hydrogen network, a steam reformer is associated to the feedstock and linear programming (LP) is applied. The investigated network consists of one steam reformer and two feedstocks. By exerting LP and the mentioned association, total annual cost decreasing is achieved in a case study in which natural gas and off‐gas were considered as feedstocks. The optimization problems of the hydrogen network comprise the hydrogen network retrofit design and the feedstock selection with respect to their cost. Nonlinear programming (NLP) and mixed‐integer nonlinear programming (MINLP) models are developed for optimization based on a two‐case study: for the first one, an existent optimization method on hydrogen networks is investigated and for the second one, revision of a recent optimization method on hydrogen networks associated by an LP model in the steam reformer unit is applied. These two cases resulted in total annual cost reductions of 34 % and 45.9 %, respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.