AbstractA pilot plant with a revolving cylindrical furnace for the gasification of organic waste at temperatures between 600 and 800°C was operated in 1976/78. The furnace wall was made of a 25 Cr/20 Ni steel.After 3000 h operation the total damage by external and internal corrosion was about 1.0 to 1.2 mm. The carbon black layer, deposited on the inner furnace wall, obviously acts as a barrier layer.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.