Abstract

The influence of CO2 addition to high rate algal ponds (HRAPS) on nitrogen removal was investigated using two pilot-scale HRAPs operated with different hydraulic retention times (HRT: 4 and 8 days), and was compared to the nitrogen removal by the 8-day HRT pond before CO2 addition was installed. Nitrogen balances were calculated by partitioning total nitrogen into organic and inorganic nitrogen (NH4+-N and NO3--N), and by separation of the organic nitrogen into particulate (PON) and dissolved organic nitrogen (DON). PON was further divided into algal organic nitrogen (AON) and bacteria organic nitrogen (BON) to investigate nitrogen mass flow in the HRAPS. This research shows that the proportion of algae in the algal/bacterial biomass in the longer 8-day HRT HRAP8d (55.6%) was appreciably lower than that in the shorter 4-day HRT HRAP4d (80.5%) when CO2 was added to control the maximum pH to <8.0 during the summer. Higher bacterial biomass in the longer 8-day HRT HRAP corresponded with higher nitrification rates, indicating that the longer 8-day HRT in the summer was detrimental for two reasons: lower algal productivity and increased nitrogen loss through nitrification/denitrification. Overall nitrogen removal of approximately 60% in the HRAPS with CO2 addition was mainly achieved by algal assimilation followed by sedimentation in the settling unit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call