Abstract

Aiming at frost heave problem existing in tunnel construction with artificial horizontal ground freezing in coastal areas, this paper puts forward an equivalent load method for frost heave simulation and a nonlinear deformation simulation method for soil around frost wall. Employing the numerical test method, the designing parameters’ influence on ground frost heave is studied systematically. These parameters include depth of tunnel, frozen wall thickness, excavation radius of tunnel and frost heaving ratio. Furthermore, some measures are proposed to reduce ground frost heave.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.