Abstract

Simulation of blasting demolition process of 84m tall frame-core tube shear wall building by using ANSYS/LS-DYNA program. Finite elemet model of reinforced concrete material using elatic-plastic model *MAT_PLASTIC_KINEMATIC, and the gravity is applied by * LOAD_BODY_GENERALIZED*, the setting of FAILTAM term to realize the formation of delay initiation blasting notches. And different blasting delay schemes are designed and the blasting effects are compared. It is of certain guiding significance to reasonably select the blasting delay parameters and predict the blasting demolition effect.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.