Abstract

A numerical model for long-term drained analysis of staged excavation is developed and validated with a case history in this paper. Kaohsiung O6 station in Taiwan is selected for this purpose. A complete soil-structure interaction is considered in the current analysis which involves structural elements for diaphragm wall and strutting with preloading. FISH scripts are used to simulate staged strutted excavation using the finite difference program FLAC. Within the framework of drained analysis for excavation in the sand, dewatering is performed for each stage of the excavation work. Field monitoring data from other published sources are used to compare with the results produced by the numerical model. The main purpose of this paper is to demonstrate the usefulness of the development in assisting design and monitoring construction of deep braced excavation. The developed model can be used to assist future design and construction projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.