Abstract
According to the characteristics of water flow movement in the junction area of island and tunnel, the “asymmetric” type double diversion dike measures for the north and south sides of basement shelter area were formulated. The 3D mathematical model of flow in the water area of local sinking base was established in this article. The hydrodynamic simulation of the diversion dike was carried out. The results showed that the flow velocity in shelter area of basement is greatly reduced. The maximum flow velocity of artificial flattening section of E33 pipe joint base is less than 0.5 m/s, and the maximum flow velocity of flattening ship construction section is not more than 0.8 m/s. The flow rate can meet the conditions of immersed tube installation. For safety reasons, E33 pipe joint placement time is suitable for the small tide period with weaker power flow.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.