Abstract

Recent advancements in engineering technology have enabled the construction of super-large underground engineering projects in China. Currently, the ventilation requirements and standards of normal-size underground spaces are used for super-large underground excavating engineering projects in China. For example, the minimum air velocity of 0.15m/s is the standard velocity for normal-size underground spaces; however, this value is also used as the required air velocity for diluting underground contaminants in super-large underground developments. This paper aims to examine the minimum ventilation requirements for super-large underground developments (S>100m2). A three-dimensional computational domain representing a full-scale underground space has been developed. The pertinent parameters such as dust concentration, smoke density, oxygen concentration and air temperature have been simulated. The results show that at some specific underground conditions, the ventilation air velocity of 0.15m/s is sufficient to control the dust level, provide required oxygen concentration and maintain the air temperature at acceptable levels during development; however, it is not sufficient to bring the CO concentration below an acceptable safe limit. This must be considered by the ventilation system designers of super-large underground developments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.