Abstract

The three-level shaft of the mixed pit shaft of Yixin Mine, built in 1983, failed continuously due to the influence of geological structure and the effect of water, which formed a collapsed space with a length of 18m,a depth of 12m,and a height of 12m at the level of -255m and to the southwest end. The 54m pit shaft below the -258m elevation of the pit shaft was filled with collapsed rocks forming a large loose body. The comprehensive processing plan for falling grouting and anchoring was proposed according to the geological conditions of the vertical shaft of the mixed pit shaft, adopting three-dimensional numerical simulation software as well as calculating the mechanical state of the vertical pit shaft surrounding rocks and using 3 to 5 parameters of Williams-Warnke failure criterion.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.