Abstract

Aiming at the center wedge of the railway freight car buffers, the forging process was analyzed and the die design was optimized. The direct finish-forging process after pre-forming process was contrasted with the finish-forging after pre-forging based on pre-forming process, and the influence of different billet sizes and die structures on the forming were analyzed and compared. To validate the different process scheme and die structure, the numerical simulations were done using FEM software deform3D. The results show that the filling capacity of billet to die cavity increases greatly by using direct finish-forging process and finish-forging die with the resistance wall and the utilization coefficient of materials is improved. This can reduce working procedure and improve the productivity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.