Abstract

According to the specific geological and topographical conditions at slope of the Hydropower Station, considering the shape and size of simulation geometric model, the position relationship between the simulated area and buildings of terminal area and boundary conditions, the dynamic model which is fit to the geological structure are selected. Using the measured stress distribution as constrained conditions, 3D initial geostress field of research area are simulated using FLAC3D program. The result of simulation analysis shows that 3D initial geostress field of research area are accurately simulated based on good combination between the measured stress data and numeriacal simulation. So as to provide a reasonable basis for further condition simulation, such as excavation and unloading conditions. It has important significance for similar geological environment projects that the method is successfully applied to simulate initial geostress of this area.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.