Abstract

It is of great significant to predict the influence of deep excavation in Ju-Zi-Zhou island, so that damage to adjacent ancient tree, and Xiang-jiang Bridge could be prevented. Based on analysis of site condition, geological profile, and strut design, the numerical model was generated in commercial available software package Flac3D, in which Mohr-Coulomb model was introduced. Then, the settlements at several key points on the ground were evaluated in each step of excavation. The calibrated results shows that, the calculated settlement agrees well with the measured. So it can be applied to predict completed state and provide a guidance for next construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.