Abstract

Growth of railhead roughness (irregularities, waviness) is predicted through numerical simulation of dynamic train–track interaction on tangent track. The hypothesis is that wear is caused by longitudinal slip due to driven wheelsets, and that wear is proportional to the longitudinal frictional power in the contact patch. Emanating from an initial roughness spectrum corresponding to a new or a recent ground rail, an initial roughness profile is determined. Wheel–rail contact forces, creepages and wear for one wheelset passage are calculated in relation to location along a discretely supported track model. The calculated wear is scaled by a chosen number of wheelset passages, and is then added to the initial roughness profile. Field observations of rail corrugation on a Dutch track are used to validate the simulation model. Results from the simulations predict a large roughness growth rate for wavelengths around 30–40 mm. The large growth in this wavelength interval is explained by a low track receptance near the sleepers around the pinned–pinned resonance frequency, in combination with a large number of driven passenger wheelset passages at uniform speed. The agreement between simulations and field measurements is good with respect to dominating roughness wavelength and annual wear rate. Remedies for reducing roughness growth are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.