Abstract

The New Mine Level Project is a 130 000 tonnes per day (tpd) panel caving project set to start in 2017. The high stresses, complex structural setting and high mining rates present major challenges in terms of seismicity management and rockburst hazard reduction. This paper is a case study of the calculation of the energy requirements needed to design a dynamic support system for this operation. This analysis starts with the estimation of the seismic source, forecast through the use of numerical modelling and verified with observed past data; later peak particle velocity (PPV) is calculated at the drifts using a PPV attenuation model and an amplification factor is used near the excavations. The amount of fractured rock around the drifts that could be ejected by a seismic event is calculated through numerical modelling. With the ejection velocity estimated from PPVs, energy demand is obtained. All the values resulting from numerical analysis were compared to historical data of similar mine sectors. As the results show that the methodology used in this paper agrees well with previously observed rockburst episodes, it was used to calculate the yielding support of this new deep mine project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.