Abstract

The paper describes the effective achievements in terms of water supply and water resources management obtained by AMGA S.p.A. within the GAP-UK Project (Interreg IV Programme). Two main issues are addressed, namely, the calibration of the numerical simulation model and the water loss reduction which has been obtained after extensive leakage identification and repair campaigns performed all over the network. In particular, the priority of leakage identification and repair has been assigned to those sectors affected by a high rate of water loss, as a result of modeling and monitoring, thus confirming some model prediction. All the identified leakages have been repaired and the effect on the global water balance of the system is evident, characterized by a minimum night flow which passed from 215 L/s down to 165 L/s.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.