Abstract

Introduction. Reviewed the features of the work of the pile on Permian claystones with the help of numerical and field experiments, analytical calculations. Materials and methods. Numerical modeling was performed in the Plaxis 3D and Midas GTS NX software packages. Full-scale tests of driven piles are made in accordance with the requirements of GOST 20276-2012. The obtained results are compared with the results of analytical calculations according to SP 24.13330.2011. Results. The scientific novelty of the investigation consists in a comparative analysis of the results of numerical modeling of the interaction of a driving pile with claystones with the results of field tests and analytical calculations. Finite element analysis in software package Plaxis 3D using Hardening Soil model shows higher values of settlement (up to 6 times) in relation to stabilized settlement of full-scale pile tests. Calculations in the software package Midas GTS NX showed overestimated values of pile settlements in relation to full-scale pile tests (13-24 times). Analytical calculations in accordance with SP 24.13330.2011 also showed overestimated (up to 3 times) values of the maximum pile settlement in relation to the stabilized settlement during full-scale pile tests. Conclusions. The calculations by the finite element method in the package Plaxis 3D and Midas GTS NX, by the analytical method according to SP 24.13330.2011, show overestimated values of settlement in relation to the stabilized settlement of piles on claystones. Using the Linear-Elastic model for claystones in numerical calculations in Plaxis 3D provides a value close to the settlement of full-scale pile. However, the use of this model is not fully justified for claystones due to the presence of residual deformations and the nonlinear character of pile settlement during loading. Necessary to correct the existing numerical and analytical methods for calculating pile foundations on claystones. It is necessary to continue the work on the further generalization of the experience of arranging piles on weathered claystones in order to evaluate the long-term work of not only a single pile, but also a pile foundation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call