Abstract

With the ending of deep-concave open-pit phosphorite extractions and gradual exhausting of shallow mineral resources, stoping of phosphorite seams has entered or will enter into underground mining. Particularly for excavating slightly inclined thin and medium-thick phosphorite orebodies, roof and surface control under different mining methods is crucial for safe and efficient exploitations. In this study, the study area is located in Kunyang Phosphorite Mine characterized by slightly inclined thin and medium-thick deposits. Based on the occurrence conditions, orebody thickness, dip angle, and more factors, the mining methods of underground phosphorite are selected, including room and pillar mining, cement backfill mining, and caving mining. Numerical analysis on roof deformation and surface subsidence under the three methods is performed. The results show that the amount of roof and surface subsidence decreases successively by the caving method, room and pillar method, and cement backfill method. The maximum roof and surface subsidence by the caving method is 45.7 and 13.3 cm, respectively. Regarding shallow orebodies, the open-pit slope is obviously disturbed by the caving method and room and pillar mining method. Hence, slope displacement monitoring should be emphasized. Compared with the other two methods, the backfill mining method can use mined wastes as backfill materials and has less influence on the roof and surface during stoping and is better at controlling slope stability.

Highlights

  • According to the changes in the thickness and inclination of the phosphorite deposits in Kunyang Phosphorite Mine, three mining methods, namely, room and pillar mining, cement backfill mining, and caving mining are selected for numerical research on roof deformation and surface subsidence during phosphorite stoping

  • Room and Pillar Mining Method Displacement monitoring lines are set in the roof, 4 m above the ore rooms

  • The maximum roof subsidence is 2.72 cm, which is 45.2% less than that in room and pillar mining

Read more

Summary

Introduction

According to the changes in the thickness and inclination of the phosphorite deposits in Kunyang Phosphorite Mine, three mining methods, namely, room and pillar mining, cement backfill mining, and caving mining are selected for numerical research on roof deformation and surface subsidence during phosphorite stoping. The numerical software 3.0 version of FLAC3D is used to simulate the roof deformation and surface subsidence in underground phosphorite mining by the room and pillar mining method, FIGURE 2 | Structure and size of rooms and pillars.

Results
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call