Abstract

The mechanized tunnelling process is mainly coupled with precast concrete segments, which include segmental rings that they are placed in their place simultaneously with the boring operation. Segments are mainly loaded by thrust jacks during the installation stage. It is essential to limit the cracks and damages of the segments during this stage to be sure of their structural integrity and sustainability. Stepping on the circumferential joint is a problem that can occur during the ring assembly. The main purpose of this study is to investigate the effect of the stepping under the load caused by thrust jacks. For this aim, the occurred stepping has been analyzed in the Tabriz metro line 2 project. In this research, the stepping has been investigated in four states, including non-stepping state, 1-cm stepping state, 2-cm stepping state, and 3-cm stepping state. Each state also has four positions, which include stepping on the right side of the ring, on the left side, on the floor, and on the roof. According to the results of the numerical modeling, increasing the amount of the stepping increases the damages. These damages have reached their highest level when the segment has stepping at the roof position.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.