The foundation pit of Yamansu hydropower station has an average depth of 70 m and has been excavated with five-level slopes. Lowering of groundwater level is important in excavation. In this study, drainage and pumping were conducted in dewatering. Pumping tests were performed to reverse hydraulic parameters and calibrate numerical models. Numerical simulations were performed to evaluate the dewatering scheme. In the first stage, powerhouse tailrace canal was excavated and used as a drainage channel to lower the groundwater level. Drawdown and hydraulic gradient were evaluated to prevent potential water inrush, erosion, piping, and slope failure. In the second stage, cutoff wall and pumping wells were evaluated to reduce the groundwater level. The influences of depth, permeability, and thickness of the cutoff wall were evaluated. Dewatering scheme was revised accordingly based on the evaluation. The optimized dewatering scheme, which can be used as a reference in similar engineering projects, was performed and verified successfully.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.