Abstract

Subsea cable laying is a risky and challenging operation faced by engineers, due to many uncertainties arise during the operation. In order to ensure that subsea cables are laid out diligently, the analysis of subsea cable tension during the laying operation is crucial. This study focuses on the fatigue failure of cables that will cause large hang-off loads based on catenary configuration after laying operation. The presented problem was addressed using mathematical modelling with consideration for a number of defining parameters, which include external forces such as current velocity and design parameters such as cable diameter. There were two types of subsea cable tension analyses studied: tensional analysis of catenary configurations and tensional analysis of lazy wave configurations. The latter involved a buoyancy module that was incorporated in the current catenary configuration that reduced subsea cable tension and enhanced subsea cable lifespan. Both analyses were solved using minimization through the gradient-based approach concerning on the tensional analysis of the subsea cable in differentconfigurations. Lazy wave configurations were shown to successfully reduce cable tension,especially at the hang-off section.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.