Abstract

Embankment filling is a process step by step. The influences of its filling height changes on the stress and deformation can not be reflected in a load. However, in the actual construction, it leads to quality accident in embankment construction that filling usually doesn’t control the thickness according to the requirement of construction specification. In order to reveal the stress and strain law of about 72 m high rock-filled embankment during the construction, and provide a scientific reference to construction quality control of the embankment, according to the typical cross section of the Hurongxi highway, using two loading modes to simulate the embankment filling, the internal stress, strain and corresponding graphics of different control points of the embankment under the various loads were presented. The results of the two loading modes are analyzed and compared. It shows that the settlement, stress and construction quality control points of the embankment are different and larger under the different loading

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.