Abstract

Taiwan Photon Source (TPS) had delivered the first synchrotron light on the last day of 2014. Installation of 16 beamlines of the first and second phases of TPS beamline project was completed. The third phase project also was launched in 2021. To confront the situation that the experimental hall is more compact, we performed Computational Fluid Dynamic (CFD) simulation to analyse the effects of the air conditioning system and various heat sources to the temperature and flow fields in the experimental hall.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call