Abstract

Abstract The article presents a method of calibration of material parameters of a numerical model based on a genetic algorithm, which allows to match the calculation results with measurements from the geotechnical monitoring network. This method can be used for the maintenance of objects managed by the observation method, which requires continuous monitoring and design alterations. The correctness of the calibration method has been verified on the basis of artificially generated data in order to eliminate inaccuracies related to approximations resulting from the numerical model generation. Using the example of the tailing dam model the quality of prediction of the selected measurement points was verified. Moreover, changes of factor of safety values, which is an important indicator for designing this type of construction, were analyzed. It was decided to exploit the case of dam of reservoir, which is under continuous construction, that is dam height is increasing constantly, because in this situation the use of the observation method is relevant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.