Abstract

The 3D finite element simulation are adopted to study the surrounding rock deformation regularity of main tunnel during the horizontal adit construction stage.The Zhongtiaoshan highway tunnel is taken as an example. The research results are shown as follows:Horizontal adit excavation destroys the original arching effect of the main tunnel, which leads to stress concentration at the intersection of primary supporting structure. The first excavation step plays an important play in the surrounding rock deformation of the intersection. The influence range of the main tunnel which due to the horizontal adit excavation is 1.2D.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.