Abstract

Nuclear power production in the Ukraine started in 1977 with the startup of the first 1000-MW power-generating unit at the Chernobyl nuclear power plant. During the period from 1977 to 1989 sixteen power-generating units with a total electric capacity of 14,880 MW were put into operation at five nuclear power plants: ten VVER-1000, two VVER-440, and four RBMK-1000. As a result of the accident in 1986 in the fourth power-generating unit and the fire in 1991 in the second power-generating unit of the Chernobyl nuclear power plant, these units are no longer operating. Therefore the total installed nuclear power plant capacity is 12,880 MW. Moreover, the construction of three more power-generating units with VVER-1000 reactors is almost completed at three nuclear power plants - Zaporozh`e, Roven, and Khmel`nitsk. These units are not in operation because of the moratorium announced by the Supreme Council of Ukraine. In connection with the Council`s decision, the Chernobyl nuclear power plant should have been shut down in 1993.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.