Abstract

Brief history of Army's nuclear power and Arctic research and development programs; installation of PM-2A nuclear power plant in Camp Century, Greenland; engineering problems and solutions related to installation and operation of plant; plant being air-transportable has only minimum of shielding; shielding was to be provided by thick snow walls; however, high level gammafield caused snow to heat up beneath reactor; temperature of 5 F insured by extra lead brick shielding.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.