Abstract

This paper focuses on multi-objective dynamic flexible job shop scheduling problem (MODFJSP) with machine breakdown. First, a multi-objective dynamic scheduling model is established, with objectives to minimize makespan and total machine workload. Second, according to the processing status of faulty machine, a hybrid rescheduling strategy including transfer rescheduling strategy and complete rescheduling strategy is proposed to react to stochastic machine breakdown. The performance of two rescheduling strategies is analyzed in terms of the scheduling efficiency and its stability, from the delay extent and initial scheduling deviation, respectively. Besides, the optimal adaptation conditions of both scheduling strategies are obtained. Furthermore, the non-dominated sorting genetic algorithm (NSGA-II) is employed to solve the constructed model. Experimental results demonstrate the effectiveness of the proposed strategies on reducing the impact of machine breakdown in real scheduling.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.