Abstract

The present investigation deals with a multi-component machining system operating under N -policy. There is a provision of k type of mixed standbys units and maintenance crew consisting of permanent repairman as well as removable additional repairmen. The life time and repair time of the units are exponentially distributed with interdependent rates. The permanent repairman can start the repair only when N failed units are accumulated in the system. As soon as a unit fails, it is replaced by an available standby unit. In case when all the standby units are exhausted, the machining system starts to function in a degraded mode due to overload. Markov model is developed by constructing the governing transient state equations which are solved by using Runge−Kutta method. Various performance measures viz. queue size distribution, expected number of failed units, cost function, etc. are evaluated. By taking numerical illustration, numerical results are computed and also depicted with the help of graphs and figures.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.