Abstract

Intermittent sand filtration is a common and effective method for treating septic tank effluent. However, if the loading rate is too high, clogging and ponding of the sand filter surface layer can occur due to the accumulation of excessive biomass and the deposition of suspended solids. This ponding limits the practicality of sand filtration as it makes it necessary to take the filter out of service for maintenance. The objective of this study was to develop and test, on-site, a new hybrid filter system that would reduce the risk of clogging at an organic loading rate substantially greater than the maximum recommended loading rate for intermittent sand filters. The system comprised a 0.6 m deep horizontal flow biofilm reactor (HFBR) over a 0.85 m deep stratified sand filter. The HFBR consisted of a stack of 20 horizontal corrugated polyvinyl chloride sheets, at 32 mm vertical spacings. The sheets were arranged so that the wastewater flowed over and back along alternate sheets down through the stack. The m...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.