Abstract

This study investigates the unrelated parallel machine scheduling problem with release dates to minimise the makespan. The solution to this problem finds wide applications in manufacturing and logistics systems. Due to the strong NP-hardness of the problem, most researchers develop heuristics, and the largest instances they consider are limited to 400 jobs. To tackle this problem, we develop a novel mixed-integer linear program (MILP) with significantly fewer integer variables than the state-of-the-art ones. The proposed MILP does not rely on a binary sequence variable usually used in the existing models. To deal with large-sized instances, a new three-stage matheuristic algorithm (TSMA) is proposed to obtain scheduling decisions. It uses a dispatching rule to sequentially schedule jobs on machines. Then a reassignment procedure is performed to reduce the makespan. Finally, it employs a re-optimisation procedure based on the proposed MILP to perform job moves and exchanges between two selected machines. We conduct numerical experiments on 1440 instances with up to 3000 jobs and 20 machines. Our results first clearly indicate that the proposed model significantly outperforms existing ones. Moreover, the results on large-sized instances show that the proposed TSMA can obtain high-quality near-optimal solutions in a short computation time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.