Abstract

In this paper, resource constrained project scheduling problem is taken and solved using genetic algorithm. This algorithm solves the problem as a whole in software development, with the limited resource the project has to be scheduled to the team members. The main aim is to schedule and optimize the resource to complete the project within time. Due to resource constraint environment, the complexity of solving the algorithm increases exponentially. So the traditional methods are not suitable to solve the resource constraint problem. The Genetic Algorithm is taken to solve the multiple resource constraints project scheduling needs. This typical NP-hard problem is solved via mathematical model via genetic algorithm. Software development projects were considered to be resource constrained and project scheduling solution makes the algorithm time efficient.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call