Abstract

The Nottingham Express Transit Line 1 was opened in March 2004. It consists of 14 route-km, of which 4 km are on-street. This paper describes the design of the on-street alignment and some of the technical issues, such as effects of combining horizontal and vertical geometry, associated with reintroducing tram track into the streets of the city of Nottingham.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.