Abstract

In relation to the management of elevated discharges of radioactive materials from the Paks Nuclear Power Plant, two different types of notification level are proposed. They relate to discharges which are above normal but below those associated with an emergency. The first is technically based (reference level) while the second (reporting level) is mainly based on considerations of public concern. The actions expected to be implemented if either of the levels is exceeded are summarized.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.