Abstract

Goyal [Goyal, S. K. 1976. Note on ‘Manufacturing cycle time determination for a multi-stage economic production quantity model’. Management Sci. 23 (3, November) 332–333.] suggests an extension of the EPQ model described in [Szendrovits, A. Z. 1975. Manufacturing cycle time determination for a multi-stage economic production quantity model. Management Sci. 22 (3, November) 298–308.]. His simultaneous optimization of both the lot size (Q) and the number of sub-batches (b) is valid provided that the transportation cost of sub-batches through all stages can be established and that the transportation cost function is of the form he suggests. We should, however, examine the basic nature of transportation costs in a plant and their usual allocation. In practice, any system of transportation equipment and personnel must be designed to cope flexibly with unscheduled activities. The timing of transport operations and the variability in loading the equipment have a great influence on costs. In addition, this transportation system must handle a whole spectrum of products, and it is difficult to allocate the costs of the system to particular product lots. As a consequence, transportation costs in a plant are usually regarded as sunk costs and are treated accordingly in most of the multi-stage inventory models.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.