Abstract
In a recent paper (He et al. in J Comb Optim 33(2):626–644, 2017), the authors considered single machine resource allocation scheduling with general truncated job-dependent learning effect. For the convex resource consumption function and limited resource cost, the problem is to minimize the weighted sum of makespan, total completion time, the total absolute deviation in completion time and resource consumption cost. They conjectured that this problem is NP-hard. In this note we show that this problem can be solved in $$O(n^3)$$ time. It is also shown that Lemma 4 in He et al. (2017) is incorrect by a counter-example.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.