Abstract
We consider the following variant of the speed scaling problem introduced by Yao, Demers, and Shenker. We are given a set of jobs and we have a variable-speed processor to process them. The higher the processor speed, the higher the energy consumption. Each job is associated with its own release time, deadline, and processing volume. The objective is to find a feasible schedule that minimizes the energy consumption. Moreover, no preemption of jobs is allowed.Unlike the preemptive version that is known to be in P, the non-preemptive version of speed scaling is strongly NP-hard. In this work, we present a constant factor approximation algorithm for it. The main technical idea is to transform the problem into the unrelated machine scheduling problem with L p -norm objective.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.