Abstract

This paper presents a nonuniform composite representation of hydroelectric power systems for use in long-term hydrothermal generation scheduling. This representation was developed from reservoir operational rules based on optimal reservoir trajectories obtained with a deterministic hydrothermal scheduling algorithm. A test system consisting of 7 large hydroelectric power plants of the Southeast Brazilian power system with 12572 MW of installed power capacity was selected for a case study. Operational cost comparisons with the classical uniform composite representation reveal significant savings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call