Abstract

We provide several non-approximability results for deterministic scheduling problems whose objective is to minimize the total job completion time. Unless 𝒫 =𝒩𝒫, none of the problems under consideration can be approximated in polynomial time within arbitrarily good precision. Most of our results are derived by APX-hardness proofs. We show that, whereas scheduling on unrelated machines with unit weights is polynomially solvable, the problem becomes APX-hard if release dates or weights are added. We further show APX-hardness for scheduling in flow shops, job shops, and open shops. We also investigate the problems of scheduling on parallel machines with precedence constraints and unit processing times, and two variants of the latter problem with unit communication delays; for these problems we provide lower bounds on the worst-case behavior of any polynomial-time approximation algorithm through the gap-reduction technique.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.