Abstract

The aim of this paper is to consider the question of who is responsible for obtaining the noise consent for work on construction sites, under Section 61 of the UK Control of Pollution Act which came into force on 1st January, 1976. One point was made clear by the civil engineering contractors at a recent conference: namely that the noise consent should be obtained before the specification goes out to tender. The consensus of opinion was that the consultant engineer was the best person to apply to the local authority for prior consent for work on construction sites, when these were situated in noise-sensitive areas.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.