Abstract

The Howard A. Hanson Dam (HHD) has brought flood protection to Washington's Green River Valley for more than 40 years and opened the way for increased valley development near Seattle. However, following a record high level of water behind the dam in January 2009 and the discovery of elevated seepage through the dam's abutment, the U.S. Army Corps of Engineers declared the dam “unsafe.” NOAA's Office of Oceanic and Atmospheric Research (OAR) and National Weather Service (NWS) worked together to respond rapidly to this crisis for the 2009/10 winter season, drawing from innovations developed in NWS offices and in NOAA's Hydrometeorology Test-bed (HMT). New data telemetry was added to 14 existing surface rain gauges, allowing the gauge data to be ingested into the NWS rainfall database. The NWS Seattle Weather Forecast Office produced customized daily forecasts, including longer-lead-time hydrologic outlooks and new decision support services tailored for emergency managers and the public, new capabilities ena...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.